Перейти к содержанию

Yerevan prepares for a new scale of metro - the capital wants to build at least four new stations

New sections should connect Achapnyak, Academic City, and Charbakh station, creating the possibility for circular train movement

Armenian authorities are considering a concept for expanding the Yerevan Metro by at least four new stations. According to Prime Minister Nikol Pashinyan, the new line should pass through the Achapnyak and Academic City districts and connect to the Charbakh station. This will allow for a more convenient system with the possibility of circular train movement.

One of the key projects will be the Achapnyak station, the construction of which has been discussed for several years. Pashinyan noted that the authorities are considering Russia's participation in its construction, given its accumulated experience in metro construction. At the same time, Achapnyak is not considered as a separate object, but as the beginning of a new stage in the expansion of the Yerevan Metro.

Image source: arka.am

Currently, the Yerevan Metro has 10 stations, and the total length of the lines is 13.4 km. The cost of the program for the construction of the Achapnyak station and related infrastructure in April 2026 was estimated at approximately 107.3 billion drams, or about $300 million. The design and estimate documentation was prepared by the Russian company Metrogiprotrans.