The system will initially be launched at the busiest northern and southern border crossing points
New equipment is capable of processing up to 10 hectares per hour and does not damage the soil
The new calculation mechanism should save drivers from overpayments due to confusion with the power of electric motors
Amendments have already been adopted
Prices fell by more than 8%
The flight between the cities will take about 5.5 hours
The image shows the station concept from Tarberak studio.
For 1.5 billion drams
Negotiations are ongoing
The initiative is designed in two stages
The exhibition is held in Barcelona
The prevention will affect the entire broadcasting network
The "AI Factory Garden" Project Transitions from Words to Real Infrastructure
Moscow and Yerevan will continue consultations on key infrastructure areas
Feasibility Study Contract to be Signed This Week, Design Phase Ahead
The new system will link the database of the Ministry of Health and the Ministry of Internal Affairs without unnecessary bureaucracy
Due to airspace closure
The meeting highlighted the need for continuous development of Armenia's engineering capabilities
They are being blocked from working and having their ratings lowered
Electric vehicle imports have grown significantly
Customers can take advantage of an installment plan with a 0% - 0% - 0% scheme
The Republic is experiencing a phase of expanding business opportunities
It was created as part of the FIA program
The project will cover approximately 700 hectares
To improve operational safety
The bank reminds of the basic rules
According to the results of January 2026, growth of 7.6%
Energy on the rise: